Tender and Contracts
Jobs
Health & Safety
Cooling Pond
Coke Oven Brook (CO1)
Tar Cell Solidification/Stabilization (CO2)
Cutoff Walls (CO5)
Surface Cap (CO6)
Collection System (CO7) / Water Treatment Plant (CO8)
Landfill (CO9)
Materials Processing Facility (TP2)
Tar Ponds Solidification/Stabilization, Channel Construction (TP6)
Tar Ponds Cap (TP7)
Business Directory
Local Economic Benefits (LEB)
Tendering Schedule
Project Environmental Protection Plan (EPP)
Environmental Management Plan (EMP)
Ferry Street Bridge (TP6C)
Future Use
 
 Surface Cap (CO6) 
 

The purpose of the Surface Cap is to prevent outside influences from coming in contact with contaminated soil and allow for revegetation at the Coke Ovens site.

Capping at the site can begin in areas where other remedial activities are not planned.

Long term monitoring of the cap is planned to ensure that the barrier's integrity is maintained.

100% Design

 

Live Cams

Bulletin Board


Notifications