Tender and Contracts
Jobs
Health & Safety
Cooling Pond
Coke Oven Brook (CO1)
Tar Cell Solidification/Stabilization (CO2)
Cutoff Walls (CO5)
Surface Cap (CO6)
Collection System (CO7) / Water Treatment Plant (CO8)
Landfill (CO9)
Materials Processing Facility (TP2)
Tar Ponds Solidification/Stabilization, Channel Construction (TP6)
Tar Ponds Cap (TP7)
Business Directory
Local Economic Benefits (LEB)
Tendering Schedule
Project Environmental Protection Plan (EPP)
Environmental Management Plan (EMP)
Ferry Street Bridge (TP6C)
Future Use
 
 2006 Cooling Pond Tender Documents 
 

Front End

STPA - Cooling Pond-Front End-For Info Only

Specifications and Appendices

Engineer Design Report

Addendum 1

Addendum 1 - 20060501
Attachment 1 Bench Scale Leachate_CP_revised
Attachment 2a - chem tables_Cooling Ponds_revised2
Attachment 2b - chem tables_South Pond_revised2
Attachment 3 - Appendix B Reference - By-LawW-101_000
Revised Drawing 1000897-03-02

Addendum 2

CP-Addendum 2-20060525
CP-Groundwater Well -draft revised-20060524
CP-Pumphouse Haz Mat-20060524
CP-Separator-20060524

Addendum 3

CP - Addendum 3.3 - 20060609

Appendix H.1

1000897-03-02
1000897-03-03

Appendix H.4

CPLogs
South Ponds piston

Appendix H.5

chem tables_Cooling Ponds_revised2
chem tables_South Pond_revised2

Cylinder Tests

A561798-R2005-07-20_10-34_N001
A561800-R2005-08-03_08-59
A561800-R2005-08-03_08-59_N001
A610036-R2006-02-13_10-13
A588209-leachate cylinder 5
A588209-R2005-09-23_11-17
A588209-R2005-09-23_11-17_N001
A595505-R2005-09-30_08-37_N001
A595505-R2005-09-30_17-01_N001

Slag and Ash

A595563-R2005-10-05_17-57
A596235-R2005-10-06_12-57

 

Live Cams

Bulletin Board


Notifications