2006 Cooling Pond Tender Documents 
 

Front End

STPA - Cooling Pond-Front End-For Info Only

Specifications and Appendices

Engineer Design Report

Addendum 1

Addendum 1 - 20060501
Attachment 1 Bench Scale Leachate_CP_revised
Attachment 2a - chem tables_Cooling Ponds_revised2
Attachment 2b - chem tables_South Pond_revised2
Attachment 3 - Appendix B Reference - By-LawW-101_000
Revised Drawing 1000897-03-02

Addendum 2

CP-Addendum 2-20060525
CP-Groundwater Well -draft revised-20060524
CP-Pumphouse Haz Mat-20060524
CP-Separator-20060524

Addendum 3

CP - Addendum 3.3 - 20060609

Appendix H.1

1000897-03-02
1000897-03-03

Appendix H.4

CPLogs
South Ponds piston

Appendix H.5

chem tables_Cooling Ponds_revised2
chem tables_South Pond_revised2

Cylinder Tests

A561798-R2005-07-20_10-34_N001
A561800-R2005-08-03_08-59
A561800-R2005-08-03_08-59_N001
A610036-R2006-02-13_10-13
A588209-leachate cylinder 5
A588209-R2005-09-23_11-17
A588209-R2005-09-23_11-17_N001
A595505-R2005-09-30_08-37_N001
A595505-R2005-09-30_17-01_N001

Slag and Ash

A595563-R2005-10-05_17-57
A596235-R2005-10-06_12-57

 

Live Cams

Bulletin Board


Notifications